Rolanka International, Inc

How to Install BioD-Pillow, BioD-Medium, and BioD-Liner for Effective Erosion Management

BioD-Liner installed in a landscape for effective erosion management and soil stabilization

Effective erosion management is crucial for maintaining healthy landscapes and preventing soil loss. One of the most effective ways to combat erosion is through the use of specialized coir products, such as BioD-Pillow, BioD-Medium, and BioD-Liner. These innovative solutions, crafted from natural coir fibers, offer both immediate and long-term benefits for soil stabilization and revegetation.

In this blog, we’ll walk you through the process of installing these products to achieve optimal erosion control and landscape restoration.

Installation Process

1. Site Preparation

Before installing BioD-Pillow, BioD-Medium, and BioD-Liner, assess the site to determine the extent of erosion and the type of terrain. Clear the area of debris, rocks, and loose soil. If necessary, regrade the site to create a stable surface for the installation of the coir products.

2. Installing BioD-Pillow Coir Revegetation Pillows

  • Placement: Position the BioD-Pillow coir revegetation pillows in the areas where vegetation is needed. Place them directly on the soil surface, ensuring that they cover the area effectively.
  • Securing: Anchor the pillows using stakes or pins to keep them in place. This step is crucial to prevent the pillows from being displaced by water or wind.
  • Covering: If necessary, cover the pillows with a layer of topsoil or mulch to protect them from UV damage and promote plant growth.

3. Applying BioD-Medium Coir Potting Soil

  • Preparation: Prepare the planting areas by loosening the soil and mixing it with BioD-Medium coir potting soil. The amount of coir potting soil needed will depend on the size of the planting area.
  • Application: Spread a layer of BioD-Medium coir potting soil over the planting area. This layer should be thick enough to support healthy plant growth and improve soil structure.
  • Planting: Plant your chosen vegetation directly into the BioD-Medium. The coir potting soil will help the plants establish strong roots and thrive in the new environment.

4. Installing BioD-Liner

  • Preparation: Cut the BioD-Liner to the appropriate length and width for the area you need to cover. Ensure that it fits the contours of the site.
  • Placement: Lay the BioD-Liner along the channel or slope, ensuring that it covers the entire area. Overlap the edges where necessary to prevent soil from washing through.
  • Securing: Secure the BioD-Liner using stakes or pins to anchor it in place. Make sure the liner is firmly attached to the soil and won’t shift during heavy rainfall.
  • Covering: If desired, cover the BioD-Liner with additional soil or mulch to enhance its effectiveness and promote vegetation growth.
BioD-Pillow coir revegetation pillow placed in a wetland area for soil stabilization and vegetation support

RoLanka International Inc. provides top-quality erosion control solutions with their range of products. From BioD-Mat blankets (BioD-Mat 40, BioD-Mat 60, BioD-Mat 70, and BioD-Mat 90) to BioD-Watl coir wattles, BioD-Block systems, and BioD-Roll coir logs, they offer comprehensive support for soil stabilization and vegetation growth.

Their BioD products are designed for effective erosion management. The BioD-Weedmat and BioD-Twine complete their versatile product lineup. For expert erosion control solutions tailored to your needs, shop at their store today!

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top